COURSE DESCRIPTION

Drilling and well construction (probably one of the most expensive features of a geothermal direct use project) is often the least understood. This training will provides the basics of Equipment and methods used for drilling and completion of geothermal wells. It provides data needed by architects, engineers, and consultants to assist them in specification writing, selection of contractors, and drilling and completion inspection.

Most direct use geothermal wells can be drilled using conventional water well technology and equipment. Most of the wells will produce water at temperatures less than boiling and without artesian flow at the surface; however, some will be hotter or will flow. Blowout preventers and other sophisticated safety equipment are not usually required; however, this does not mean that there are not significant Safety considerations that should be addressed. Many of the wells have water above 140 0 F and this will scald. Public and drilling crew safety must be ensured. The cementing portion may appear to be overly detailed and long. However, the author’s view is that, all too often, Cementing is considered simply as a means of plugging up the annulus between the casing and borehole wall. Little attention is paid to methods and materials, and a poor cement job is the result. This can result in lost production zones, cold water leaking into production zones, geothermal water leaking into freshwater zones, and reduced useful well life. Also, in view of the increasing awareness and concern about inter-zonal Migration and possible fresh water aquifer contamination, proper cementing is of increasing importance.

COURSE OUTLINE

Drilling Equipment

Cable Tool
Rotary Drilling
Other Thypes of rotator drilling
Downhole harmer
Reverse circulation
Drill through casing driver
Dual tube reverse circulation
4.Core Drilling

5. Directional Drilling

Drilling Fluids

Long Circulation
Drilling Muds
Density
Viscosity
Sand content
Filter cake
Gelling
Lost circulation materials
Recognizing geothermal zones
3. Polymer fluids

4. Air based Fluids

5. Plumbness and Alignment

Well Design

Casing Materials

Grouting and Cementing

Blow out Prevention Equipment

Injection wells

Well Specifications

BID sheets

Well Costs

PARTICIPANTS TRAINING

Senior operational and engineering personnel involved in drilling / workover operations; OIMs, Drilling Superintendents, Drilling Engineers, Drilling Supervisors.

Metode Bali Training Center :

Presentation
Discussion
Case Study
Simulation
Evaluation (Pre and Post Test)

Fasilitas Bali Training Center :

Instruktur yang kompeten
Training kit
Materi / Handout
Souvenir
Kaos
Tas
Softfile materi
Sertifikat pelatihan
Antar jemput bandara-hotel tempat menginap.

Jadwal Bali Training Center :

2 sd 4 Januari 2018
27 sd 29 Maret 2018
7 sd 9 Mei 2018
17 sd 19 Juli 2018
12 sd 14 September 2018
16 sd 18 Oktober 2018
21 sd 23 November 2018
26 sd 28 Desember 2018

Note : Jadwal tersebut dapat berubah menyesesuaikan dengan kebutuhan calon peserta. Pelatihan juga bisa diselenggarakan pada waktu weekend, koordinasi dahulu dengan tim penyelenggara.

Lokasi dan investasi Bali Training Center :

Yogyakarta (6.500.000 IDR / participant)
Jakarta (6.500.000 IDR / participant)
Bandung (6.500.000 IDR / participant)
Bali (7.500.000 IDR / participant)
Surabaya (6.000.000 IDR / participant)
Lombok (7.500.000 IDR / participant)

Note : Apabila perusahaan membutuhkan paket in house training, anggaran investasi pelatihan dapat menyesuaikan dengan anggaran perusahaan. Kami Juga melayani penyelenggaraan training di luar negeri seperti Singapura, Taiwan, Korea, Malaysia, Jepang, dan lainnya.

Email: bali.infotrainingcenter@gmail.com

Be the first to comment

Leave a Reply

Your email address will not be published.


*